| |

|
Introduction to LOLER, PUWER and HASWA |
|
| |

|
The requirements for ‘third party’ inspections and colour codes
|
|
| |

|
Responsibilities of the Banksman, Slinger and Crane Operators
|
|
| |

|
Introduction to ‘Lifting Equipment’
|
|
| |

|
Introduction to methods of slinging, a wide variety of loads
|
|
| |

|
The pre-use inspection criteria of lifting accessories
|
|
| |

|
The formulation of risk assessments and lifting plans
|
|
| |

|
Methods of communication using radio and hand signals
|
|
| |

|
Load weight assessment, sling angles and tensions
|
|
| |

|
Storage and loading methods of containers and half heights
|
|
| |

|
The safe execution of the lifting of a variety of loads
|
|
| |

|
And much more... |
|
| |
|
| |
|